Gulf
Dredging started its piling activities in 1980
with the sheet piling works at Doha East Power
Station and since then has completed several
piling projects involving piles of various types
and sizes.
Equipped
with the state-of-the-art piling equipment and
long years of experience in this field, GDC
is capable of handling any onshore or offshore
piling work. Some of the prestigious piling
projects executed under GDC contract include
:
|
Az-Zour
Power Station
Intake
Structural Sheet Piling works
Total tonnage of sheet piles driven =
12,000 metre tones, offshore 2.5 km long
wall, with anchorage systems and reinforced
concrete capping beam. |
|
.
|
Sabiya Power Station
Sheet
Pile Cellular Walls (2.5 km long) Frodingham
straight web sheet piles. Steel tubular
Piles 1800 mm diameter at Sabiya Power
Station.
|
|
.
|
|
Salmiya Water
Front Phase - V Project
Curved
Marina Wall and Anchor Wall for the
Marina.
|
|
|
|
Marina Anchor
Piles
Projects
include Sharq Water Front Marina, Fahaheel
Sea Club Marina, KPTC Marina at Ras Al-Ardh,
Al-Shaab Sea Club, Private Marinas including
Messilah Palace Marina, Private Marine
at Funaitees etc.
|
|
|
| |
|
|
|