Gulf Dredging started its piling activities in 1980 with the sheet piling works at Doha East Power Station and since then has completed several piling projects involving piles of various types and sizes.

Equipped with the state-of-the-art piling equipment and long years of experience in this field, GDC is capable of handling any onshore or offshore piling work. Some of the prestigious piling projects executed under GDC contract include :

Az-Zour Power Station

Intake Structural Sheet Piling works
Total tonnage of sheet piles driven = 12,000 metre tones, offshore 2.5 km long wall, with anchorage systems and reinforced concrete capping beam.

.
Sabiya Power Station

Sheet Pile Cellular Walls (2.5 km long) Frodingham straight web sheet piles. Steel tubular Piles 1800 mm diameter at Sabiya Power Station.


.

Salmiya Water Front Phase - V Project

Curved Marina Wall and Anchor Wall for the Marina.

Marina Anchor Piles

Projects include Sharq Water Front Marina, Fahaheel Sea Club Marina, KPTC Marina at Ras Al-Ardh, Al-Shaab Sea Club, Private Marinas including Messilah Palace Marina, Private Marine at Funaitees etc.

 

 